Road Improvements 2017

Resurfacing Projects

  • Church Road- Route 74 to Roosevelt Ave.
  • Taxville Road- Greenwood Rd to Old Taxville Rd.
  • Weldon Drive- Bannister Road to Weldon Court
  • Weldon Court entire length
  • Deneb Road entire length
  • Gabrielle Court entire length
  • Onyx Road entire length
  • Breezewood Road-entire length
  • Beeler Avenue-entire length
  • Logan Road-entire length
  • Woodlawn Avenue- entire length
  • Kotur Avenue-entire length
  • Herman Drive-Church Road to Downing
  • Crocus Lane Herman to Marigold
  • Marigold Road- Herman to Lilac
  • Quaker Court-entire length
  • Friends Circle-entire length
  • Plain Way-entire length
  • Berlin Court- entire length

Microsurfacing

Poplars Road- Entire length

Crack Sealing

Kenneth Road-Roosevelt Ave to Loucks Road

Storm Sewer

Adams St.- Installation of approximately 800 Lineal Ft of pipe and inlets

Township Staff will be notifying affected Residents with Door Knockers before Milling/base Repair and paving operations. With the exception of Church Rd streets will be closed during the paving process till the asphalt cools enough for vehicular traffic. Staff will coordinate with Penn Waste to ensure garbage and recycling collection. Your patience during the summer paving season is appreciated.